Structural Monitoring

Request:

  • Monitor Structural Movement in Road Bridges over a 12 month period

Methodology:

  • Installation of Monitoring Prisms & routine monitoring with Leica TS30 Total Station by Two Surveyors

End Product:

  • Records of 3D Structural Movement over the required time period
Download: "Monitoring Results"

 

Back to Case Studies